Blog Details

2
Nov
2017
Posted By: 0 Comment(s)

Office power system

Installing power in a office environment is pretty straight forward.

We can chase a wall out,install the cables,plaster up socket,install socket fronts on job done,

Then we are asked to move a socket or add a socket, add some network data points, include some telephone outlets,

Dado or perimeter trunking is designed to be adaptable.

It houses all modern outlets including hdmi, fibre, cat5, telephone along with power.

This is the start of a project for a video editing suite,

We have installed power only and the budget only allowed one linear length.

We will add network and hdmi outlets once the customer has allocated what equipment he is having.

If you would like information on this system please contact us for a free no obligation quote.

Leave a Reply

Your email address will not be published.